SG Rasau Water Supply Scheme (Stage 1)
Design and Development
PROJECT DETAILS
Client | Pengurusan Air Selangor Sdn Bhd
Architect | Monosists Architects & Engineering Sdn Bhd
Completion |Q2 2025
Location | Selangor
The project includes the design and build of an intake structure with 1,400 million (Mld) capacity to draw augmented raw water from the ex-mining ponds at Taman Putra Permai, Puchong, as well as a 700 Mld water treatment plant near Tanjung Dua Belas.
Other structures include a 2.4m diameter twin-pipe connecting the intake structure and the water treatment plant and two overhead bridges crossing the Elite Highway and SKVE Highway.
The development of this water supply scheme is important as Sungai Selangor Scheme is currently the only source of raw water supply to Klang Region. The project is scheduled for completion by end of June 2025.
SG Rasau Water Supply Scheme (Stage 1)
Property development
PROJECT DETAILS
Client | Pengurusan Air Selangor Sdn Bhd
Architect | Monosists Architects & Engineering Sdn Bhd
Completion |Q2 2025
Location | Selangor
The project includes the design and build of an intake structure with 1,400 million (Mld) capacity to draw augmented raw water from the ex-mining ponds at Taman Putra Permai, Puchong, as well as a 700 Mld water treatment plant near Tanjung Dua Belas.
Other structures include a 2.4m diameter twin-pipe connecting the intake structure and the water treatment plant and two overhead bridges crossing the Elite Highway and SKVE Highway.
The development of this water supply scheme is important as Sungai Selangor Scheme is currently the only source of raw water supply to Klang Region. The project is scheduled for completion by end of June 2025.
SG Rasau Water Supply Scheme (Stage 1)
Property development
PROJECT DETAILS
Client | Pengurusan Air Selangor Sdn Bhd
Architect | Monosists Architects & Engineering Sdn Bhd
Completion |Q2 2025
Location | Selangor
The project includes the design and build of an intake structure with 1,400 million (Mld) capacity to draw augmented raw water from the ex-mining ponds at Taman Putra Permai, Puchong, as well as a 700 Mld water treatment plant near Tanjung Dua Belas.
Other structures include a 2.4m diameter twin-pipe connecting the intake structure and the water treatment plant and two overhead bridges crossing the Elite Highway and SKVE Highway.
The development of this water supply scheme is important as Sungai Selangor Scheme is currently the only source of raw water supply to Klang Region. The project is scheduled for completion by end of June 2025.